Signal Control Board and Channel
4 output board(s), supporting 44 channel(s)
Timing Strategy
Supporting 64 phases, 255 patterns, 64 plans, 255 Schemes(Adjustable on demand)
Signal Control Mode
•Fixed Cycle: A preset time is given to each movement every cycle, Multiple phase/cycle parameters can be set in different time periods.
•Full-Actuated: Real-time optimization of green light timing based on traffic data, such as lane flow, in all lanes at the intersection.
•Semi-Actuated: Based on traffic data in certain lanes, such as flow, it provides real-time optimization of the green light duration for the main lanes and reduces the unnecessary green light duration for the secondary lanes.
•Self-Adaptive: For congested intersection scenarios, calculate and optimize the cycle and phase durations based on historical traffic data of the all lanes to Improve the traffic efficiency.
•Single-Point Optimization: According to historical and real-time traffic data, timing parameters are calculated in advance and adjusted in real time during running.
•Coordinates Green wave: Consider the linkage of multiple intersections, set parameters such as phase difference, and ensure that vehicles in the main direction encounter green lights all the way.
•Pedestrian Crossing: Adjust signal timing based on pedestrian in demand.
•Special control: Light Disable, Yellow Flash and All red.
Control Type
Local mode,web control,HCM control,manual key control,third-party platform control
Manual Control
Auto, Manual, Step-to-Step, Yellow Flash, All Red and Special Directional control
Web Configuration
Supports web browser configuration, 3D interface display of the real-time status of the intersection
Time Synchronization
Supports NTP time synchronization, satellite time synchronization (GPS antenna installation required), manual time configuration, and third-party platform time synchronization
Countdown Timer Access
Self-learning mode,Pulse countdown,National standard 2004/2014 mode